Categories
Electrical Interior News

Project Trans Am for February 2013 – Intermediate Shaft, Floor Shifter and Dashboard

February was one very busy month, the amount of time I got in the garage shows. Sorry only one picture this month.

Intermediate Shaft Painted

On the second week of February we had one of those 49 degree winter days, so I used the opportunity to paint the intermediate shaft. It came out excellent. I used Dupli-Color etching primer followed by Dupli-Color engine enamel cast gray. It looks pretty darn close to the natural metal finish.

Floor Shifter Installed

While I finish installing the insulation on the floors, I went ahead and installed the floor shifter. I also painted the top plate, which I will install when it comes time to install the center console.

Shift Lever

Dashboard Preparation

I started preparing the dashboard for reinstalling into the car. While test fitting the dash cap I got last summer, I noticed I had a gap fitment problem. I then took the spare dash I have in the crawl space and tested the cap on that dash, and it had the same problem. I called the dash cap company and within3 days they got back to me and said they would send me a replacement cap in the coming week.

While I got the dash out and apart, I also fixed the grab handle mounting so the handle is nice and tight. I used some scrap pieces of plastic I had for other projects to reinforce the backing of the grab handle mounting tabs.

I’m currently taking measurements of the space above the glove box to see if that would be a good spot to mount my 4 port fuse box that I plan on using for both the radio constant power and power windows. This 4 blade fuse terminal will be wired directly to the battery/alternator, providing plenty of power for the windows and stereo. If my plan works, the fuses will be mounted above the glove box, so only someone who knows to look would know the fuses are there.

What’s Next

Believe it or not, I have 6 more spots I want to put small patches of insulation on the floor. Once that’s done I will be installing the carpet, kick panels dash, gauges, center console, steering column and front seats. I expect to have all of this done in March leaving April for working on the engine and transmission.

Comments are closed.