May was not so productive, between family plans and work, not much got done. Never the less I did get a few things done.
Interior and Wiring
The remaining interior trim is now installed, including the t-top trim, pillar trip and such. I also installed the center console while I replaced the center console gauges (more on that below). This leaves the steering column, seats, and seat belts.
Replacement Center Console Gauges and Oil Pressure Line
While test fitting the center console gauges I discovered the gauges I got would not adapt to the 1/8″ NTP hose that I ran through the firewall. While searching for a replacement oil pressure gauge, I discovered a brand called ISSPro, which look nearly identical to the factory gauges. I ordered both an oil pressure and water temperature gauge. They look sharp!
I also decided instead of running a 4′ long braided line from the gauge to the engine, I decided to get two 2′ braided lines and a firewall elbow. This gives me more clearance at the firewall and it also looks much more professional.
Engine Work – Measure Head’s CC, Made Throttle bracket adapter, Painted Intake
I learned how to mesure the cylinder head CCs using a kit from Jegs. I made a few measurements in a few cylinders and they avreeage between 93-97 CC’s. I was conservative on my measurements as well, so they are more than likely 2 CC’s more than actual measurements, so 91-95 CC’s.
What’s Next
Finish the interior and get the motor with transmission in the car, all hopefully by Fathers day!